Halyard Instrument Co.Drawing set HL-2291ISO 128 · Third angle
Atlas 9
Field LanternGeneral arrangement
The Atlas 9 is a brass-bodied field lantern built for coastal survey crews working eighteen-hour rotations in salt spray. Every dimension on this sheet is taken from the machined master at 20 °C. Drawings are read left to right, top to bottom; callout bubbles cross-reference the parts schedule on Sheet 03.
Sheet 01
Front elevation
View A — datum at base plane
Fig. 1.1 — Elevation
Scale 1:2 · mm
Parts schedule
- All linear dimensions in millimetres unless otherwise stated.
- Remove burrs and break sharp edges 0.3 max.
- Brass components to be lacquered after final polish; do not lacquer sealing faces.
- Globe seat to be tested at 40 kPa for 60 seconds, no leakage permitted.
- Do not scale from this drawing.
Sheet 02
Section B–B
Cut on vertical datum · hatch at 45°
Fig. 2.1 — Section
Scale 1:1 · mm
Tolerance envelope
- General
- ±0.20 mm
- Machined bores
- H7 fit
- Surface finish
- Ra 1.6 µm
- Concentricity
- 0.05 TIR
- Hatching indicates material cut by the section plane; adjacent parts hatched at opposing angles.
- Thread engagement to be no less than 12 mm at assembly torque of 9 N·m.
- Maximum fill line is 41.2 mm above the inner floor — an ullage of 18 % is required for thermal expansion.
- Wick channel to run free with 0.4 mm clearance over the full stroke.
Sheet 03
Material schedule
Bill of materials · issue C| Item | Description | Material | Mass (g) | Finish |
|---|---|---|---|---|
| 01 | Bail handle | Stainless 316L | 64 | Bead blast |
| 02 | Vented cap | Brass CZ121 | 148 | Lacquer |
| 03 | Borosilicate globe | Glass 3.3 | 312 | Fire polish |
| 04 | Burner core assembly | Nickel / brass | 96 | Passivate |
| 05 | Knurled adjuster | Brass CZ121 | 22 | Satin |
| 06 | Reservoir body | Drawn brass | 402 | Lacquer |
| 07 | Cast base plate | Gunmetal LG2 | 386 | Shot peen |
| 08 | Globe seat gasket | Silicone 70 Sh | 8 | — |
Sheet 04
Revision history
Controlled document · do not copyRevDateChangeBy
A2024-11-04First issue for tooling review.M. Okonjo
B2025-02-18Globe wall increased 2.0 → 2.4 after thermal shock testing.R. Vance
C2025-09-30Base draft angle corrected to 14°; BOM item 08 added.M. Okonjo
D2026-05-12Thread changed to M24 × 1.5; engagement note 7 revised.L. Serrano