The 2026 Impact Ledger
We drill toward the heat the Earth has always kept, and hand it back as power you can plan a life around.
Azimuth builds closed-loop geothermal wells that run through every night and every storm, on a footprint the size of a parking lot. This is the year we made the case in numbers — metered at the substation, logged at the drill floor, and independently assured.
Scroll to roll the ledger Figures reset & re-count on return Audited to March 2026
Since first steam, 2019
Every gigawatt-hour firm and dispatchable — the kind of power a hospital, a smelter, or a small city can be built around, counted here the moment the ledger comes into view.
Ledger 01 / 03
Energy on the wire
What the grid actually received this year, metered at the substation — not a projection, not a nameplate.
Ledger 02 / 03
Kilometers of ground truth
Every figure below is drilled, cored, and cased. The Earth keeps the honest books; we just read them.
Ledger 03 / 03
The climate arithmetic
Displacement, capital, and the people on the other end of the line. The part of the ledger that outlives the balance sheet.